Skip to main content
GO SELL

Case studies · Anonymised references

Real projects, evidence at the right level.

Four real projects in Europe, the Middle East and Africa. Published metrics distinguish covered scope from impacts still being measured.

Situation · Deployment · Outcome

From operational complexity to measurable outcomes.

For each project: the initial situation, what was deployed and the outcome observed.

GO VERIFYIndicators being validated

Financial services · Morocco

Industrializing the control of complex banking files

Starting point
Heterogeneous files, documents in French and Arabic, manual controls and an initial 33% of documents routed to human review.
Deployment
Hundreds of rules and keywords added, detection of contracts and supporting documents, concurrent batch processing and verification on real documents.
Result
The main detections have been corrected and batch processing sharply increases throughput. The final review rate is still being validated by the client.
files processed in parallel
10×
Source to verify
total time per file
≈1×
Source to verify
of documents flagged for review at the start
33%
Source to verify

10× is the number of files processed in parallel, ≈1× the total time per file, and 33% an initial human-review value. None of these figures is a validated financial gain.

GO VISION1 site in production · 6 PoCs

Retail · Saudi Arabia

Turning existing cameras into retail intelligence

Starting point
Video streams were available but hard to use for objectively measuring footfall, queues, service time, dwell time and employee–customer interactions.
Deployment
Camera mapping, KPI definition, local Edge server, stream integration, calibration, user acceptance testing, training and 30 days of hypercare.
Result
A first store in production and an organized move from PoC to a repeatable model across different store formats.
site in production
1
Source to verify
PoCs under way
6
Source to verify
video processed on site
Edge
Source to verify
GO CHECK · Deployment

Automotive · France and Belgium

Securing the execution of after-sales technical campaigns

Starting point
A large network had to apply repair procedures rigorously, document the evidence and limit over-quality that drives warranty costs.
Deployment
Standardized engineering controls, direct exchanges with photos, videos and comments, digital action plans and cross-site campaign tracking.
Result
More consistent execution, better traceability of interventions and faster exchanges between the network and the engineering department.
vehicles in scope
400K+
Source to verify
countries steered
2
Source to verify
GO CHECK · Deployment

Building materials · France

Standardizing QHSE audits across a national industrial network

Starting point
Safety and quality controls spread across cement, aggregates and concrete activities, with a need for consolidated visibility and consistent tracking of corrective actions.
Deployment
Digitized field audits, non-conformity reporting, action plan assignment and multi-site steering by every level of management.
Result
One shared standard, centralized traceability and stronger compliance discipline across the entire French scope.
industrial sites covered
≈200
Source to verify
activities harmonized
3
Source to verify

Covered scope ≠ business gain. Displayed metrics reflect documented scopes and measurements; financial gains not yet validated are not presented as achieved results.

Let's build the next reference together.

Let's define the scope, KPIs and success criteria of a pilot on your sites.